Authorised PM Surya Ghar Yojana vendor

Turn your rooftop into a power plant, with the subsidy paperwork handled for you.

ArkGo Solutions designs, installs and services rooftop solar systems for homes and businesses — from the first site visit to the final subsidy payout.

25-yearperformance warranty
Tier-1certified panels
Rooftop solar panel installation on an Indian home

Trusted for:

PM Surya Ghar Yojana installations Residential & commercial rooftops Net-metering & grid connection Tier-1 panel & inverter brands

Follow the sun through the day

Drag the slider to any hour and watch a 3 kW rooftop system respond in real time.

6 AM12 PM6 PM

Time of day

12:00 PM

Generating now

3.0 kW

Peak generation ☀️

What we handle for you

From the first measurement to the last inspection — every step of going solar, under one roof.

Residential solar

Rooftop systems sized to your household's actual usage, not a generic package.

Commercial & industrial

Larger installations for factories, offices and institutions, built around your load profile.

Subsidy assistance

We file the PM Surya Ghar Yojana application and track it through to disbursal.

Maintenance & AMC

Periodic cleaning, performance checks and annual maintenance contracts.

What PM Surya Ghar Yojana actually pays for

The scheme subsidises part of your system cost directly — the rest is recovered through lower electricity bills. Rough numbers, by system size:

System size Typical monthly usage Subsidy
1 kWUp to 120 units₹30,000
2 kW120–200 units₹60,000
3 kW & aboveOver 300 units₹78,000

Figures are illustrative and confirmed for your case during the site survey.

Estimate your savings

Move the slider to match your average monthly electricity bill.

₹3,000

Recommended size

Estimated subsidy

Monthly savings

Payback period

Get an exact quote

From survey to switch-on

Six steps, start to finish. Most homes are generating power within 4–6 weeks of approval.

1

Site survey

A technician measures your roof and checks shadow-free area and load.

2

Design & quote

We size the system and share a fixed, itemised quotation.

3

Subsidy filing

Your PM Surya Ghar Yojana application is submitted and tracked.

4

Installation

Panels, inverter and wiring installed by our certified crew.

5

Inspection & net-metering

Discom inspection and net-meter connection arranged.

6

Switch-on & support

System goes live, with AMC and monitoring support after.

What homeowners say

“My electricity bill dropped from around ₹4,200 to under ₹600 a month. The subsidy paperwork was the part I dreaded most, and ArkGo handled all of it.”

— Homeowner, Patna

“They walked us through every step before installation started — no surprises in the final bill. Installation itself took two days.”

— Homeowner, Muzaffarpur

“We compared three vendors. ArkGo was the only one who explained the net-metering process clearly before we signed anything.”

— Homeowner, Darbhanga

Placeholder quotes — swap in for real customer feedback once available.

Common questions

Most residential rooftop owners with a valid electricity connection and suitable roof space qualify. We confirm eligibility for free during the site survey.

Once the subsidy application is approved, physical installation typically takes 1–3 days depending on system size. Grid inspection and net-metering approval add a few more weeks.

Generation dips on cloudy days but doesn't stop. Our AMC plans include periodic cleaning and performance checks to keep output close to rated capacity.

Yes — we can connect you with partner lenders offering solar-specific loans, and provide the documentation they typically ask for.

Panels typically carry a 25-year performance warranty; inverters carry 5–10 years depending on brand. Exact terms are listed on your quotation.

Ready to see what your roof could save?

Share a few details and a technician will call to schedule your free, no-obligation site survey — usually within 48 hours.

+91 180-000-0000 hello@arkgosolutions.in

No spam — this only reaches our survey team.

Book Free Survey